Skip to main content
Conference Schedule
Browse Technical Program
Browse by Track
Browse by Topic
Browse By Title
Browse By Authors
Keyword Search
Speaker Biographies
PORTS ’19 Website
Login
Toggle navigation
Home
Conference Schedule
Browse Technical Program
Browse by Track
Browse by Topic
Browse By Title
Browse By Authors
Keyword Search
Speaker Biographies
PORTS ’19 Website
Final Program
Browse by Track
Browse by Track
Type here to filter the list
A
Monday, Sep 16
10:30 am
519671 - Waterfront Stormwater Treatment Design for Any Commodity Anywhere
Location: Sterlings 1-2
Laura Weiden, P.E. – Kennedy Jenks; Ross W. Dunning, P.E. – Kennedy Jenks; Ben Fuentes, P.E. – Kennedy Jenks
Monday, Sep 16
10:30 am
1A - Environmental (Stormwater, Emissions)
Location: Sterlings 1-2
Frank G. Davidson, III, P.E., S.E., ENVSP – Jacobs
Monday, Sep 16
10:50 am
522485 - Innovative Design for New Post Construction Stormwater Management Standards at Port of Oakland
Location: Sterlings 1-2
Ian D. Sequeira, P.E., MTOP – AECOM; Bryan Paine, P.E., QSD, ENVSP – AECOM; Dylan LaFrance, P.E. – AECOM
Monday, Sep 16
11:10 am
522585 - Industrial Stormwater Treatment on a 200-acre Container Terminal
Location: Sterlings 1-2
Ellis Beckwith, P.E. – KPFF Consulting Engineers; Scott Adamek, P.E., LG – Floyd|Snider; Laynl Wachter – Floyd|Snider
Monday, Sep 16
11:30 am
522669 - Impacts of Implementing Zero Emission Container Handling Equipment on a Container Terminal
Location: Sterlings 1-2
Kerry Simpson, P.E., MSCE, M.ASCE – Moffatt & Nichol; Douglas Thiessen, D.P.E. – Moffatt & Nichol; Pekka Ranta, MScEMBA – Moffatt & Nichol
Monday, Sep 16
1:30 pm
513875 - A New PIANC Guideline for Managing Environmental Risks of Navigation Infrastructure Projects
Location: Sterlings 1-2
Rebecca Gardner, P.E. – Anchor QEA, LLC; Burton C. Suedel – USACE Engineering Research and Development Center; Kevin Kane – North Queensland Bulk Ports Corporation; David W. Moore – USACE ERDC Environmental Laboratory; Capt. Kevin Allen – Belfast Harbour; John Lally, P.E. – Lally Consulting LLC; Miran Vanwonterghem – Flanders Agency for Maritime and Coastal Services; Amy Parry – Atkins; Todd S. Bridges – USACE Engineering Research and Development Center
Monday, Sep 16
1:30 pm
2A - Environmental (Innovative Programs)
Location: Sterlings 1-2
Mustafa Samad, PhD, P.Eng., M.ASCE – Bechtel Nuclear, Security and Environmental
Monday, Sep 16
1:50 pm
519741 - Remediating a Working Waterfront
Location: Sterlings 1-2
Matthew J. Page, P.E. – GZA GeoEnvironmental
Monday, Sep 16
2:10 pm
522597 - Benefits and Challenges of Port-Sponsored Mitigation Banks
Location: Sterlings 1-2
Dan Berlin, PWS – Anchor QEA, LLC; Jack Malone, PhD – Anchor QEA, LLC
Monday, Sep 16
2:30 pm
522663 - Large Scale Floating Wetlands for Urban Waterfronts
Location: Sterlings 1-2
Matthew Alan. McCarty, P.E., S.E., M.ASCE – McLaren Engineering Group; Adam Ravestein, PLA – ASG Architects; Christopher Streb, P.E. – Biohabitats, Inc.; Dennis O'Heney, E.I.T. – McLaren Engineering Group
Monday, Sep 16
3:30 pm
519425 - La Quinta Terminal Mitigation: Dredged Material Beneficial Reuse for Estuarine Habitat Creation
Location: Sterlings 1-2
Aaron Horine, P.E. – Mott MacDonald; Paul D. Carangelo, REM, CESM, PWS – Port of Corpus Christi; Luis Maristany, P.E. – Mott MacDonald
Monday, Sep 16
3:30 pm
3A - Environmental (Contaminant Mitigation)
Location: Sterlings 1-2
Philip J. Erbland, PE, MS – S&ME, Inc.
Monday, Sep 16
3:50 pm
519707 - Sediment Transport Analysis and Cap Design Criteria for Mission Bay Ferry Landing, San Francisco, CA
Location: Sterlings 1-2
Abhishek Sharma, PhD – Mott MacDonald; Frank Salcedo, P.E. – Mott MacDonald; Scott Fenical, P.E., M.ASCE – Mott MacDonald; Kathryn Purcell – Port of San Francisco; Jonathan Roman – Port of San Francisco
Monday, Sep 16
4:10 pm
521985 - Filling a Freshwater Lake—Sediment Remediation Considering Net Environmental Benefit for Multiple Stakeholder Goals
Location: Sterlings 1-2
Jessi Massingale, P.E. – Floyd|Snider; Megan King, P.E. – Floyd|Snider; Don Robbins – Port of Seattle
Monday, Sep 16
4:30 pm
522592 - Sediment Cleanup Challenges in the East Waterway
Location: Sterlings 1-2
Dan Berlin, PWS – Anchor QEA, LLC; Tom Wang, P.E. – Anchor QEA, LLC; Kathy Ketteridge, P.E., PhD – Anchor QEA, LLC; Greg Brunkhorst – Anchor QEA, LLC
Tuesday, Sep 17
8:30 am
519227 - Using Simulation to Evaluate and Optimize Port System – a Case Study
Location: Sterlings 1-2
Yu (Alan) Zhang, PhD, P.E. – Moffatt & Nichol; Rebeca Aguilar – Moffatt & Nichol; Gerardo Lazcano – Port of Valparaiso
Tuesday, Sep 17
8:30 am
4A - Port Planning and Operations, Terminal Planning, Simulation and Modeling
Location: Sterlings 1-2
Ralph Petereit, P.E., D.P.E., PMP, ENVSP – WSP
Tuesday, Sep 17
8:50 am
519406 - Discrete Event Simulation Case Studies in Planning Advanced Container Terminals
Location: Sterlings 1-2
Yu (Alan) Zhang, PhD, P.E. – Moffatt & Nichol; Lambertus C. Vermeer – Moffatt & Nichol; Jennifer Chase; Trevor Humphreys
Tuesday, Sep 17
9:10 am
519477 - Discrete Event Simulation for Oil Transshipment Facility
Location: Sterlings 1-2
Liyenita Widjaja, MSc – Moffatt & Nichol; Cheng-Feng Tsai, MS, P.E. – Moffatt & Nichol
Tuesday, Sep 17
9:30 am
519709 - Time-window Based Berth and Yard Allocation Planning of Container Vessels
Location: Sterlings 1-2
Jialin Xu – Dan F. Smith Department of Chemical Engineering, Lamar University; Sujing Wang, PhD – Department of Computer Science, Lamar University; Qiang Xu, PhD – Dan F. Smith Department of Chemical Engineering, Lamar University
Tuesday, Sep 17
10:30 am
511395 - MILCON P-547 Power and Propulsion Facility
Location: Sterlings 1-2
William A. Young, P.E., S.E., M.ASCE – Whitman, Requardt & Associates; Yuwei Chang, S.E., P.E., M.ASCE – Whitman, Requardt & Associates; Michael Barnhart, P.E., M.ASCE – Whitman, Requardt & Associates
Tuesday, Sep 17
10:30 am
5A - Port Engineering (Structural, Military)
Location: Sterlings 1-2
Matthew Alan. McCarty, P.E., S.E., M.ASCE – McLaren Engineering Group
Tuesday, Sep 17
10:50 am
518648 - General Berthing Pier Replacement at Naval Base San Diego
Location: Sterlings 1-2
Henrik Dahl, P.E. – COWI; Alberto Sanchez, P.E. – US Navy - NAVFAC SW; James Connolly, S.E. – COWI
Tuesday, Sep 17
11:10 am
522571 - Unified Facilities Criteria Program, and UFC 4-152-01 Design: Piers and Wharves
Location: Sterlings 1-2
Anthony Farmer, P.E., M.ASCE – NAVFAC Atlantic; Roderick Whitsel, P.E., S.E., M.ASCE – Moffatt & Nichol; M. R. Hasan, P.E., M.ASCE – Matrix PDM Engineering
Tuesday, Sep 17
11:30 am
522779 - The Super Flood Basin
Location: Sterlings 1-2
Noah J. Elwood, P.E. – Appledore Marine Engineering, LLC; Matthew Teeden, P.E., S.E. – Appledore Marine Engineering, LLC
Tuesday, Sep 17
2:00 pm
519233 - SMART Planning Requires Smart Modeling - Getting the Most Value for Your Ship Simulation Dollar
Location: Sterlings 1-2
Dennis W. Webb, PEDNE – Webb Simulation Consulting; Timothy Shelton, P.E. – USACE ERDC Coastal and Hydraulics Laboratory; Keith Martin – USACE ERDC Coastal and Hydraulics Laboratory
Tuesday, Sep 17
2:00 pm
6A - Navigation & Waterways, Dredging
Location: Sterlings 1-2
Thomas McCollough, PE. LM ASCE – Moffatt & Nichol
Tuesday, Sep 17
2:20 pm
520981 - Dredging Techniques and Technology to Facilitate a Large Dredge Project – Pier 4 Reconfiguration
Location: Sterlings 1-2
Scott J. Stainer, P.E. – KPFF Consulting Engineers; Kyle Dickens, P.E. – Manson Construction Co.; Trevor K. Thornsley, P.E. – Port of Tacoma
Tuesday, Sep 17
2:40 pm
521802 - Port of Hueneme Phasing Plan Through Collaboration for a Wharf Deepening
Location: Sterlings 1-2
Chris Mansour, P.E., ENVSP – KPFF Consulting Engineers; Christina Birdsey – Port of Hueneme; Todd Graham
Tuesday, Sep 17
3:00 pm
522561 - The Port of Long Beach Is Big Ship Ready – Overview of Terminal Mooring & Berthing Studies
Location: Sterlings 1-2
Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Cheng Lai, P.E., S.E., M.ASCE – Port of Long Beach; Xiuying Xing, PhD, P.E. – Moffatt & Nichol; John Chun, P.E., M.ASCE – Port of Long Beach
Tuesday, Sep 17
4:00 pm
520542 - Through the Deck and Under the Crane at the Coast Guard Yard in Baltimore MD
Location: Sterlings 1-2
Kirk F. Riden, P.E. – Appledore Marine Engineering, LLC; Benjamin Cook, E.I.T. – Appledore Marine Engineering, LLC; Danielle Somma, P.E. – Appledore Marine Engineering, LLC; Thomas Ducharme, P.E. – Appledore Marine Engineering, LLC
Tuesday, Sep 17
4:00 pm
7A - Port Infrastructure (Upgrades, Construction)
Location: Sterlings 1-2
Heath K. Pope, P.E., M.ASCE
Tuesday, Sep 17
4:20 pm
522433 - Berths 214-220 Redevelopment Construction Lessons Learned at the Port of Los Angeles
Location: Sterlings 1-2
Edward Han, P.E. – City of Los Angeles - Harbor Department; Angel Lim, P.E., S.E. – Port of Los Angeles - Harbor Department; Long Nguyen – City of Los Angeles - Harbor Department; Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Tuesday, Sep 17
4:40 pm
522668 - Challenges in Selection, Anchorage Design, and Installation of Mooring Hooks on Existing Structures
Location: Sterlings 1-2
Rune Iversen, P.E. – Simpson Gumpertz & Heger; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Julie A. Galbraith, PE – Simpson Gumpertz & Heger
Tuesday, Sep 17
5:00 pm
522754 - Decommissioning of the SR520 Floating Bridge, Seattle, WA
Location: Sterlings 1-2
M. Ali Naeem, P.E. – Simpson Gumpertz & Heger; Rune Iversen, P.E. – Simpson Gumpertz & Heger; Sam Yao, PhD, P.E. – Simpson Gumpertz & Heger
Wednesday, Sep 18
8:30 am
520072 - 3-Dimensional Nonlinear Static Analysis for Waterfront Structures with Torsional Response Under Seismic Loading
Location: Sterlings 1-2
Pooja Jain, P.E., S.E. – Moffatt & Nichol; JIm Hogan – Puget Sound Energy; Stuart Stringer, P.E., S.E. – Moffatt & Nichol; Thomas McCollough, PE. LM ASCE – Moffatt & Nichol
Wednesday, Sep 18
8:30 am
8A - Port Engineering (Extreme Events - Seismic)
Location: Sterlings 1-2
Joseph Galloway, P.E. – WSP
Wednesday, Sep 18
8:50 am
521826 - Seismic Design Standards for Nonstructural Components and Nonbuilding Structures in MOTEMS
Location: Sterlings 1-2
Rakesh K. Goel, PhD, P.E. – Cal Poly, San Luis Obispo
Wednesday, Sep 18
9:10 am
522569 - The Port of Los Angeles Seismic Code Update for Container Wharves
Location: Sterlings 1-2
Angel Lim, P.E., S.E. – Port of Los Angeles - Harbor Department; Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Wednesday, Sep 18
9:30 am
520110 - An Integrated Assessment of Hazard Vulnerability and Resilience to Seaports
Location: Sterlings 1-2
Jieun Hur, PhD, P.E. – The Ohio State University; Abdollah Shafieezadeh, PhD – Ohio State University; Zhenhua Chen, PhD – The Ohio State University
Wednesday, Sep 18
10:30 am
499672 - Load Forecasting for Automated Terminals: A Summary of the Middle Harbor Terminal Power Requirements
Location: Sterlings 1-2
Kent Sayler, P.E. – P2S Inc; Daniel Ihlenfeldt, P.E. – P2S Inc
Wednesday, Sep 18
10:30 am
9A - Equipment & Systems (Innovative Technologies)
Location: Sterlings 1-2
Philip J. Erbland, PE, MS – S&ME, Inc.
Wednesday, Sep 18
10:50 am
514617 - Leveraging BIM Tools to Coordinate and Design a Navy Pier Extension
Location: Sterlings 1-2
Justin Rygel, P.E., S.E. – WSP; TJ Schilling, P.E., S.E. – BergerABAM
Wednesday, Sep 18
11:10 am
520075 - “Drone: The New Point and Shoot Camera” Using Drones to Enhance Waterfront Inspection and Design
Location: Sterlings 1-2
David L. Marcotte, II, P.E. – Appledore Marine Engineering, LLC; Kirk F. Riden, P.E. – Appledore Marine Engineering, LLC; Eric Levesque, P.E. – Appledore Marine Engineering, LLC; Michael Moser, P.E. – Appledore Marine Engineering, LLC; Daniel Del Tufo, E.I.T. – Appledore Marine Engineering, LLC
Wednesday, Sep 18
11:30 am
522236 - Port of Long Beach Zero Emission Terminal Equipment Demonstration Projects at Piers E, J and T
Location: Sterlings 1-2
Ron Groves, P.E. – City of Long Beach, Harbor Department (Port of Long Beach); William Stone, P.E. – City of Long Beach, Harbor Department (Port of Long Beach)
B
Monday, Sep 16
10:30 am
519203 - Installation of 48-inch Diameter Test Piles at the Port of Alaska
Location: Sterlings 3
Donald G. Anderson, P.E., G.E., D.GE – Jacobs; Douglas R. Playter, P.E. – Jacobs; George J. Newman, P.E., PMP, MSPM – Jacobs; Jeff J. Bool, P.E., PMP – Jacobs; Todd C. Cowles, P.E., MPE – Port of Alaska
Monday, Sep 16
10:30 am
1B - Port Engineering (Geotechnical and Geosciences)
Location: Sterlings 3
Monique A. Anderson, P.E. – Shannon & Wilson, Inc.
Monday, Sep 16
10:50 am
519331 - Geotechnical Issues Encountered and Overcome in the Development of Colombia’s Gateway Port
Location: Sterlings 3
Thomas J. Shafer, Jr., P.E., MD#12065 – Moffatt & Nichol
Monday, Sep 16
11:10 am
519565 - Uncharted Territory: Challenges and Success in the Terminal 5 Berth Modernization Test Pile Program
Location: Sterlings 3
Joanna Hingle, PE, SE – Port of Seattle; Brice Exley, P.E. – Hart Crowser; Paul Meyer, P.G. – Port of Seattle; Doug Lindquist, P.E.G.E – Hart Crowser
Monday, Sep 16
11:30 am
522479 - Geotechnical Considerations for Development of a Fireboat Station at the Port of Long Beach
Location: Sterlings 3
Raj S. Varatharaj, P.E., G.E., M.ASCE – Earth Mechanics, Inc.; Pratheep Pratheepan, P.E. – Earth Mechanics, Inc.; Cheng Lai, P.E., S.E., M.ASCE – Port of Long Beach; Kristen Hulett, P.E., S.E. – Jacobs; Stacey Jones, P.E. – Jacobs; Joel Aguilar, P.E., S.E., M.ASCE – Port of Long Beach; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Monday, Sep 16
1:30 pm
521319 - Rehabilitation, Safety Improvement, and Life Extension of a Geriatric Concrete Marine Oil Terminal
Location: Sterlings 3
Gayle S. Johnson, P.E. – Simpson Gumpertz & Heger; Cheng Lai, P.E., S.E., M.ASCE – Port of Long Beach; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; John Chun, P.E. – Port of Long Beach
Monday, Sep 16
1:30 pm
2B - Port Engineering (Inspection, Rehabilitation and Redevelopment)
Location: Sterlings 3
Thomas Spencer, P.E., S.E., D.P.E. – Moffatt & Nichol
Monday, Sep 16
1:50 pm
522526 - Berth 177-179 Wharf Rehabilitation & Replacement at the Port of Los Angeles
Location: Sterlings 3
Angel Lim, P.E., S.E. – Port of Los Angeles - Harbor Department; Chinh Le, P.E. – Port of Los Angeles; Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol
Monday, Sep 16
2:10 pm
522788 - Dry Dock 3 Caisson Replacement & Seat Repairs
Location: Sterlings 3
Noah J. Elwood, P.E. – Appledore Marine Engineering, LLC; Eric Levesque, P.E. – Appledore Marine Engineering, LLC; Linn Lebel, P.E. – Naval Facilities Engineering Command (NAVFAC)
Monday, Sep 16
2:30 pm
522968 - Emergency Wharf Repair at North Embarcadero, Port of San Diego, CA
Location: Sterlings 3
Matthew N. Martinez, S.E., P.E., ACOPNE – Moffatt & Nichol
Monday, Sep 16
3:30 pm
521979 - Seismic Design of Anchored Bulkheads – the Geotechnical Perspective
Location: Sterlings 3
Monique A. Anderson, P.E. – Shannon & Wilson, Inc.
Monday, Sep 16
3:30 pm
3B - Port Engineering (Seismic Design of Bulkheads, Innovative Solutions)
Location: Sterlings 3
Shannon Kinsella, PE, PMP – Reid Middleton
Monday, Sep 16
3:50 pm
522726 - Anchored – the Structural Perspective
Location: Sterlings 3
Pooja Jain, P.E., S.E. – Moffatt & Nichol; Monique A. Anderson, P.E. – Shannon & Wilson, Inc.
Monday, Sep 16
4:10 pm
521989 - Seismic Design of Anchored Bulkheads: Tieback Bulkhead Example
Location: Sterlings 3
Joseph Galloway, P.E. – WSP; Chad Goodnight, P.E., PhD – BergerABAM; Pooja Jain, P.E., S.E. – Moffatt & Nichol; Monique A. Anderson, P.E. – Shannon & Wilson, Inc.; Stuart Stringer, P.E., S.E. – Moffatt & Nichol; Stephen E. Dickenson, PhD, P.E., D.P.E., M.ASCE – New Albion Geotechnical, Inc.; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Monday, Sep 16
4:30 pm
519616 - Target Reliability Indices for Quay Walls, Jetties, and Flexible Dolphins
Location: Sterlings 3
Alfred Roubos, PhD – Port of Rotterdam; Dirk Jan Peters, Sr.; Rhapael Steenbergen
Tuesday, Sep 17
8:30 am
519764 - Wharf Structure Design Consideration of Pier E Redevelopment Project at the Port of Long Beach
Location: Sterlings 3
Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Cheng Lai, P.E., S.E., M.ASCE – Port of Long Beach; Raj S. Varatharaj, P.E., G.E., M.ASCE – Earth Mechanics, Inc.; Theresa Richards, P.E. – Moffatt & Nichol
Tuesday, Sep 17
8:30 am
4B - Port Engineering (Structural)
Location: Sterlings 3
Matthew Teeden, P.E., S.E. – Appledore Marine Engineering, LLC
Tuesday, Sep 17
8:50 am
522097 - Precast Construction or Upgrade/Expansion of Two Operating Solid Bulk Terminals in Colombia
Location: Sterlings 3
Jyotirmoy Sircar, P.E., M.ASCE – WSP; Carlos E. Ospina, PhD, P.E., M.ASCE – BergerABAM; Miguel Forero, P.E. – BergerABAM; Jordan Lagnado – Soletanche Bachy
Tuesday, Sep 17
9:10 am
522469 - Wharf Upgrade Considerations for Large Low Profile Cranes
Location: Sterlings 3
Anna Dix, S.E. – Liftech Consultants Inc.; Arun K. Bhimani, S.E. – Liftech Consultants Inc.; Claude Gentil, P.E. – Port Everglades Department of Broward County
Tuesday, Sep 17
9:30 am
522533 - Wharf Improvements for New Panamax Size Vessels
Location: Sterlings 3
Edward H. Stehmeyer, III, P.E. – South Carolina Ports Authority; Ralph Petereit, P.E., D.P.E., PMP, ENVSP – WSP
Tuesday, Sep 17
10:30 am
515002 - Wave, Mooring and Downtime Studies for Tibar Bay Port Development, East Timor
Location: Sterlings 3
Yang Zhang, PhD, P.E. – Jacobs; Liang He, P.E. – Jacobs; Daoxian Shen, PhD, P.E. – Jacobs; Umar Farooque, P.E. – Jacobs
Tuesday, Sep 17
10:30 am
5B - Port Engineering (Coastal)
Location: Sterlings 3
Jack C. Cox, PE, DCE, DPE, DNE – Edgewater Resources
Tuesday, Sep 17
10:50 am
518882 - Scour Protection at Modern Cruise Terminals: Case Studies of Port Canaveral Cruise Terminals 1 and 3
Location: Sterlings 3
Shannon C. Clarke, M.ASCE – Mott MacDonald; Scott Fenical, P.E., M.ASCE – Mott MacDonald; Frank Salcedo, P.E. – Mott MacDonald; Abhishek Sharma, PhD – Mott MacDonald; Gary Ledford, P.E., M.ASCE – Jacobs; William Crowe, P.E., M.ASCE – Canaveral Port Authority
Tuesday, Sep 17
11:10 am
520213 - Design, Testing and Construction of a Wave Energy Absorbing Quay Wall
Location: Sterlings 3
Mauricio A. Wesson, P.E. – Smithgroup; Jack C. Cox, PE, DCE, DPE, DNE – Edgewater Resources
Tuesday, Sep 17
11:30 am
490779 - Ferry Vessel Propeller Wash Effects on Scour at the Kingston Ferry Terminal
Location: Sterlings 3
Chris Stearns, S.E. – Washington State Ferries; Sam Kastner; Alex Horner-Devine; Jim Thomson
Tuesday, Sep 17
2:00 pm
520658 - Canadian Design Requirements for Marine LNG Facilities
Location: Sterlings 3
Martin L. Eskijian, MS, MS,ENGR, PE, DPE – Martin L. Eskijian, Consultant; Pooja Jain, P.E., S.E. – Moffatt & Nichol
Tuesday, Sep 17
2:00 pm
6B - Port Engineering (Design Standards for Piers and Wharves)
Location: Sterlings 3
Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol
Tuesday, Sep 17
2:20 pm
522628 - Analysis of Measured Marine Oil Terminal Berthing Velocities
Location: Sterlings 3
Rune Iversen, P.E. – Simpson Gumpertz & Heger; Maximo L. Argo – Simpson Gumpertz & Heger; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Justin J. Pyun, PE, SE – Simpson Gumpertz & Heger; Samuel Cortes – Simpson Gumpertz & Heger
Tuesday, Sep 17
2:40 pm
522618 - A Proposed Rational Approach to Design of Fenders and Supporting Structures in the US
Location: Sterlings 3
Rune Iversen, P.E. – Simpson Gumpertz & Heger; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Brian Phan, P.E. – Simpson Gumpertz & Heger; Justin J. Pyun, PE, SE – Simpson Gumpertz & Heger
Tuesday, Sep 17
4:00 pm
522449 - Overview of the San Francisco Seawall Earthquake Safety Program
Location: Sterlings 3
Steven Reel, P.E., MS – Port of San Francisco; Matt Wickens, P.E. – Port of San Francisco; Rod Iwashita, P.E. – Port of San Francisco
Tuesday, Sep 17
4:00 pm
7B - Port Engineering (San Francisco Seawall Earthquake Safety and Disaster Prevention Program)
Location: Sterlings 3
Donald Oates, P.E., P.Eng., D.P.E., DBIA – KPFF Consulting Engineers
Tuesday, Sep 17
4:20 pm
522649 - Port of San Francisco Seawall - Geotechnical Approach for Seismic Vulnerability Optimization
Location: Sterlings 3
Thaleia Travasarou, PhD, P.E., G.E. – Fugro; Jose Ugalde, P.E. – Fugro; Adam Price, PhD – Fugro; Nason McCullough, PhD, P.E., G.E., M.ASCE – Jacobs
Tuesday, Sep 17
4:40 pm
522538 - Seismic Analyses for San Francisco Port-Wide Risk Assessment
Location: Sterlings 3
Julie A. Galbraith, PE – Simpson Gumpertz & Heger; Matt Wickens, P.E. – Port of San Francisco; Nason McCullough, PhD, P.E., G.E., M.ASCE – Jacobs; Gayle S. Johnson, P.E. – Simpson Gumpertz & Heger
Tuesday, Sep 17
5:00 pm
522532 - Seismic Fragility and Risk Assessment of Waterfront Structures at the Port of San Francisco
Location: Sterlings 3
Gayle S. Johnson, P.E. – Simpson Gumpertz & Heger; Hope A. Seligson – Seligson Consulting; Matt Wickens, P.E. – Port of San Francisco; Justin J. Pyun, PE, SE – Simpson Gumpertz & Heger
Wednesday, Sep 18
8:30 am
520060 - Port of Long Beach, Marine Maintenance Dock Facilities at Pier D, Berth 48 Project
Location: Sterlings 3
Joel Aguilar, P.E., S.E., M.ASCE – Port of Long Beach; Cheng Lai, P.E., S.E., M.ASCE – Port of Long Beach; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.; Prabin Tuladhar, P.E. – AECOM; Ian D. Sequeira, P.E., MTOP – AECOM
Wednesday, Sep 18
8:30 am
8B - Port Engineering (Structural)
Location: Sterlings 3
Noah J. Elwood, P.E. – Appledore Marine Engineering, LLC
Wednesday, Sep 18
8:50 am
522084 - Precast Counterfort Seawall Simplifies Road Widening Project in USVI
Location: Sterlings 3
V.K. Kumar, P.E., S.E., M.ASCE – BergerABAM; Jyotirmoy Sircar, P.E., M.ASCE – WSP; Justin Berglund – American Bridge Company
Wednesday, Sep 18
9:10 am
522564 - Upgrade of Berths 226-236 Container Wharf Terminal at the Port of Los Angeles
Location: Sterlings 3
Angel Lim, P.E., S.E. – Port of Los Angeles - Harbor Department; Marco A. Sanchez, P.E. – Port of Los Angeles; Brian Correa, P.E. – Port of Los Angeles; Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Alahesh Thurairajah, P.E., G.E., M.ASCE – Earth Mechanics, Inc.; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Wednesday, Sep 18
9:30 am
522648 - Wings over Washington Foundation Design
Location: Sterlings 3
Louis Klusmeyer, P.E., S.E. – Port of Corpus Christi
Wednesday, Sep 18
10:30 am
519015 - Upcoming Changes to ASCE/COPRI 61-19 Chapter on Ancillary Components
Location: Sterlings 3
Brett W. King, S.E. – GHD; Gayle S. Johnson, P.E. – Simpson Gumpertz & Heger
Wednesday, Sep 18
10:30 am
9B - Port Engineering (ASCE 61)
Location: Sterlings 3
Gayle S. Johnson, P.E. – Simpson Gumpertz & Heger
Wednesday, Sep 18
10:50 am
519317 - Seismic Design of Pile-supported Wharves: Effect of New Steel Strain Limits in ASCE 61-19
Location: Sterlings 3
Helge Frandsen – Royal HaskoningDHV; Duyet Nguyen, BSc – Royal HaskoningDHV
Wednesday, Sep 18
11:10 am
521478 - Back to the Future: Proposed Pipe Pile Strain Limits for ASCE 61-19
Location: Sterlings 3
Robert Harn, P.E., S.E., M.ASCE – BergerABAM; Carlos E. Ospina, PhD, P.E., M.ASCE – BergerABAM; Dimitris Pachakis, PhD, P.E., CEng, M.ICE – COWI UK Limited
Wednesday, Sep 18
11:30 am
522528 - Evaluation of ASCE61-14 Nonlinear Static Procedures for Estimating the Seismic Response of Wharves
Location: Sterlings 3
Juan D. Sandoval, MSc – Universidad de los Andes; J. Paul Smith-Pardo, PhD, S.E., P.E. – Seattle University; Juan C. Reyes, PhD – Universidad de los Andes
C
Monday, Sep 16
10:30 am
520085 - A Look into Premature Failure of Vertically Welded Pipe Piles
Location: Benedum
Matthew Teeden, P.E., S.E. – Appledore Marine Engineering, LLC; Lukian Harris
Monday, Sep 16
10:30 am
1C - Port Engineering (Structural)
Location: Benedum
Daniel W. O'Connor, PE – Collins Engineers, Inc.
Monday, Sep 16
10:50 am
522566 - The Port of Los Angeles Wilmington Waterfront Promenade: “A Window to the Waterfront”
Location: Benedum
Hugo A. Cisneros, P.E. – Port of Los Angeles; Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Zachary Chrisco, P.E. – Sasaki; Raj S. Varatharaj, P.E., G.E., M.ASCE – Earth Mechanics, Inc.; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Monday, Sep 16
11:10 am
522613 - Increasing Lift Height and Improving Ship to Shore Gantry Cranes Inside an Active Container Yard
Location: Benedum
Edward H. Stehmeyer, III, P.E. – South Carolina Ports Authority
Monday, Sep 16
11:30 am
521903 - New PIANC Guidelines for Oil & Gas Marine Terminal Design & Assessment
Location: Benedum
Ron Heffron, P.E., D.P.E., F.ASCE – COWI
Monday, Sep 16
1:30 pm
519727 - Decision Aid: Maintain, Partly Rebuild, or Reconstruct an Operating Facility?
Location: Benedum
Colleen J. Ackermann, P.Eng. – Advisian; Jason Braun, P.Eng. – Advisian
Monday, Sep 16
1:30 pm
2C - Port Planning and Operations (Facilities Maintenance)
Location: Benedum
Charlie Roberts, P.E.,D.PE,M.ASCE
Monday, Sep 16
1:50 pm
522346 - Establishing a Rational Inspection Criteria for Composite Materials Used in Waterfront Structures
Location: Benedum
Rune Iversen, P.E. – Simpson Gumpertz & Heger; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Jesse Hooge – Bedford Technology; Jim Watson – Bedford Technology; Maximo L. Argo – Simpson Gumpertz & Heger
Monday, Sep 16
2:10 pm
938068 - Bayesian Damage Prediction of Berm Breakwaters in the Arctic
Location: Benedum
Maria Pontiki, MS – Department of Civil and Environmental Engineering, University of Delaware
Monday, Sep 16
3:30 pm
519766 - The Long Beach On-Dock Rail Support Facility: An Innovative Local Plan in a Complex Environment
Location: Benedum
Mark A. Erickson, P.E. – Port of Long Beach
Monday, Sep 16
3:30 pm
3C - Landside Connections, Rail
Location: Benedum
Mike Wray, P.E., S.E., ENVSP, LEEDAP, M.ASCE – WSP
Monday, Sep 16
3:50 pm
522503 - San Pedro Bay Portwide Rail Planning for Today and 2040
Location: Benedum
Michael Leue, P.E. – AECOM; Carlo Luzzi – Port of Long Beach; Shashank Patil, P.E. – Port of Long Beach; Kerry Cartwright, P.E. – Port of Los Angeles; Ian D. Sequeira, P.E., MTOP – AECOM
Monday, Sep 16
4:10 pm
519758 - Overcoming Structural Design Challenges for Train Unloading Station at Coal Terminal in Colombia
Location: Benedum
Siddharth Srivastava, P.E. – Moffatt & Nichol
Monday, Sep 16
4:30 pm
938074 - Extending the Service Life of Mooring Cells
Location: Benedum
Zach J. Usselton – University of Kentucky
Tuesday, Sep 17
8:30 am
522226 - Terminal Rail Operation Efficiency Enhancement and Wharf Structural Integrity Improvements
Location: Benedum
Daniel T. Shieh, P.E. – Port of Long Beach; George Paulsen, P.E. – Jacobs
Tuesday, Sep 17
8:30 am
4C - Terminal Planning and Design (Expansion, Redevelopment)
Location: Benedum
Jeff Massengill, P.E., D. PE – HDR
Tuesday, Sep 17
8:50 am
522428 - Redevelopment of an 1880 Banana Export Terminal
Location: Benedum
John Bardi, P.E., M.ASCE – BergerABAM; Ajaya P. Malla, P.E. – BergerABAM; Ramses Orlando. Lobo Ortiz – Chiquita Guatemala
Tuesday, Sep 17
9:10 am
522431 - The Port of Vancouver WA's $275 Million, Multi-year West Vancouver Freight Access Expansion Program
Location: Benedum
Kurt W. Reichelt, P.E. – HDR
Tuesday, Sep 17
9:30 am
522513 - Translating Automated Container Terminal Operations into Terminal Infrastructure Design
Location: Benedum
Robert E. Kaptein, P.E. – Moffatt & Nichol; Ashebir Jacob, P.E. – Moffatt & Nichol; Reza Alamir, P.E. – Moffatt & Nichol
Tuesday, Sep 17
10:30 am
519177 - Port Canaveral Cruise Terminal 3 Wharf Design and Construction
Location: Benedum
Gary Ledford, P.E., M.ASCE – Jacobs; William Crowe, P.E., M.ASCE – Canaveral Port Authority; Scott Fenical, P.E., M.ASCE – Mott MacDonald; Prem Kumar, P.E. – Jacobs; Desiderio Maldonado, P.E., M.ASCE – Atkins North American, Inc.; Songtao Yang, PhD, P.E., M.ASCE – Jacobs
Tuesday, Sep 17
10:30 am
5C - Terminal Planning and Design (Cruise and Ferry)
Location: Benedum
Edward H. Stehmeyer, III, P.E. – South Carolina Ports Authority
Tuesday, Sep 17
10:50 am
519838 - Seismic Analysis and Design of Ferry Plaza for the Downtown San Francisco Ferry Terminal
Location: Benedum
Azadeh Bozorgzadeh, PhD – Moffatt & Nichol; Satish Chilka – Moffatt & Nichol; James Brady – Moffatt & Nichol
Tuesday, Sep 17
11:10 am
522681 - Resiliency of NYC Ferry System
Location: Benedum
Michael Grant, P.E. – McLaren Engineering Group; Victoria Christini, P.E. – McLaren Engineering Group; Kaitlyn McGrath – McLaren Engineering Group
Tuesday, Sep 17
2:00 pm
514120 - Port of Long Beach Land Use Study
Location: Benedum
Hardik M. Gajjar, ENVSP – WSP; Tracy Fidell, P.E. – WSP; Matt Plezia – Port of Long Beach; Tony Chan, PhD – Port of Long Beach
Tuesday, Sep 17
2:00 pm
6C - Port Planning and Operations (Master Planning)
Location: Benedum
Andrew Cairns, P.E., D.P.E., PMP – Mott MacDonald
Tuesday, Sep 17
2:20 pm
514220 - A New Berth for Halifax
Location: Benedum
Thomas A. Ward, PE/SE, D.P.E. – WSP
Tuesday, Sep 17
2:40 pm
520578 - Revitalizing the Providence, Rhode Island Waterfront: The Showpiece of a Renaissance City
Location: Benedum
Danielle Goudreau, E.I.T. – Pare Corporation; Ryan McCoy, PE – Pare Corporation
Tuesday, Sep 17
3:00 pm
522893 - Evolution of America’s Ports: Rise of Real Estate as Diversification Strategy
Location: Benedum
Matt Trowbridge, P.E., S.E., P.Eng. – Moffatt & Nichol; Rob Sloop, P.E. – Moffatt & Nichol; Robert Nathan, P.E. – Moffatt & Nichol
Tuesday, Sep 17
4:00 pm
519243 - Key Design Issues for Large Low Profile Container Cranes
Location: Benedum
Kenton Lee, S.E. – Liftech Consultants Inc.; Michael A. Jordan, S.E. – Liftech Consultants Inc.; Patrick W. McCarthy, P.E. – Liftech Consultants Inc.
Tuesday, Sep 17
4:00 pm
7C - Port Planning and Operations, Equipment and Systems
Location: Benedum
Douglas Thiessen, D.P.E. – Moffatt & Nichol
Tuesday, Sep 17
4:20 pm
519511 - Measuring Port Disruptions with Automatic Identification System Data
Location: Benedum
Brandan M. Scully, P.E. – USACE Research & Development Center; Katherine F. Chambers – USACE Research & Development Center
Tuesday, Sep 17
4:40 pm
519579 - US West Coast Port Infrastructure Needs for Development of Floating Offshore Wind Facilities
Location: Benedum
Aaron Porter, P.E. – Mott MacDonald; Shane Phillips, P.E., D.P.E., D.CE – Mott MacDonald
Tuesday, Sep 17
5:00 pm
522088 - Reconstructed Quay Wall Serves Bulk Operations and Heavy Module Transfer
Location: Benedum
Jyotirmoy Sircar, P.E., M.ASCE – WSP; V.K. Kumar, P.E., S.E., M.ASCE – BergerABAM; Carlos E. Ospina, PhD, P.E., M.ASCE – BergerABAM; Romuald Dagron – Soletanche Bachy
Wednesday, Sep 18
8:30 am
519577 - Dynamic Planning for Flexible Port Infrastructure After Panama Canal Expansion: A Real Case Study
Location: Benedum
Oscar I. Soto Reyes, MSc – Panama Canal Authority; Poonam Taneja – Delft University of Technology; Ben-Jaap Pielage – Witteveen+Bos Consulting Engineers; Maurits van Schuylenburg – Port of Rotterdam; IHE Delft
Wednesday, Sep 18
8:30 am
8C - Terminal Planning, Navigation and Waterways, Neo-Panmax Preparedness
Location: Benedum
Chris Cornell, P.E., S.E., M.ASCE – WSP
Wednesday, Sep 18
8:50 am
522092 - Optimized Design Addresses Site and Constructability Challenges for Container Wharf in Iraq
Location: Benedum
Carlos E. Ospina, PhD, P.E., M.ASCE – BergerABAM; V.K. Kumar, P.E., S.E., M.ASCE – BergerABAM; Jyotirmoy Sircar, P.E., M.ASCE – WSP; Victor Dempsey, B.Eng, LLM, C.Eng, MICE, MCIArb – ICTSI
Wednesday, Sep 18
9:10 am
522452 - Planning, Design, and Construction for Expansion of PSA’s Panama Hub Port
Location: Benedum
Ricardo McNeil, MEng – PSA Global; Manfred Zinserling, P.E., S.E., M.ASCE – WSP USA; David Taylor, CEng, M.ICE – PSA Global
Wednesday, Sep 18
9:30 am
522555 - Forecasting Squat of Post Panamax Container Ships in PortMiami's Entrance Channel
Location: Benedum
Gordon Thomson, P.E., DCE – W.F. Baird & Associates; Wim van der Molen, P.Eng., PhD – Baird Australia Pty. Ltd.; David Taylor, CPEng, MEng – Baird Australia Pty. Ltd.; Doug Scott, P.Eng., PhD – W.F. Baird & Associates; Jon Nitkin
Wednesday, Sep 18
10:30 am
519462 - Seawall Movement and Piling Design at the San Francisco Waterfront
Location: Benedum
Erik Soderberg, S.E. – Liftech Consultants Inc.; Di Liu, P.E. – Liftech Consultants Inc.
Wednesday, Sep 18
10:30 am
9C - Port Engineering (Retrofit, Upgrades)
Location: Benedum
Matthew N. Martinez, S.E., P.E., ACOPNE – Moffatt & Nichol
Wednesday, Sep 18
10:50 am
519735 - Port of Long Beach, Pier J, Berths 245-247 Landside Crane Rail Upgrade Project
Location: Benedum
Joel Aguilar, P.E., S.E., M.ASCE – Port of Long Beach; Cheng Lai, P.E., S.E., M.ASCE – Port of Long Beach; Omar A. Jaradat, PhD, P.E., D.P.E., M.ASCE – Moffatt & Nichol; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Wednesday, Sep 18
11:10 am
522531 - Unique Wharf Upgrade to Diversify Operations for Larger RO/RO Shipments & New Containerized Cargo
Location: Benedum
Nathan A. Watson, P.E. – KPFF Consulting Engineers; Adam Bergman, P.E. – KPFF Consulting Engineers; John Klekotka, P.E. – Port of Everett; Steve Hager, P.E. – Port of Everett
Wednesday, Sep 18
11:30 am
522536 - Performance Based Seismic Retrofit Solutions for Wharf Preservation
Location: Benedum
Sam Yao, PhD, P.E. – Simpson Gumpertz & Heger; M. Ali Naeem, P.E. – Simpson Gumpertz & Heger; Sara E. Barrett, P.E. – Simpson Gumpertz & Heger; Joshua Core, P.E. – Simpson Gumpertz & Heger
D
Monday, Sep 16
10:30 am
519848 - Cascading Seismic and Tsunami Actions in a Pile-Supported Quay
Location: Commonwealth 2
Cláudia Reis, PhD – Instituto Superior Tecnico, Universidade de Lisboa
Monday, Sep 16
10:30 am
1D - Port Engineering (Extreme Events - Seismic)
Location: Commonwealth 2
Michael Wagner, PE – Urban Engineers, Inc
Monday, Sep 16
10:50 am
520750 - Seismic Performance of Pile-Supported Piers and Wharves Subjected to Foundation Deformations
Location: Commonwealth 2
Arash Khosravifar, PhD, P.E., M.ASCE – Portland State University; Milad Souri – Portland State University; Stephen E. Dickenson, PhD, P.E., D.P.E., M.ASCE – New Albion Geotechnical, Inc.; Scott Schlechter, P.E., G.E., D.P.E., M.ASCE – GRI; Nason McCullough, PhD, P.E., G.E., M.ASCE – Jacobs
Monday, Sep 16
11:10 am
522537 - Combined Kinematic and Inertial Seismic Analysis of Marine Structures
Location: Commonwealth 2
Julie A. Galbraith, PE – Simpson Gumpertz & Heger; M. Ali Naeem, P.E. – Simpson Gumpertz & Heger; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger
Monday, Sep 16
11:30 am
522546 - Effect of Moored Vessels on the Dynamic Response of Marginal Wharves Subjected to Ground Motions
Location: Commonwealth 2
J. Nicolas Villamizar-Gonzalez, MSc – Moffatt & Nichol; J. Paul Smith-Pardo, PhD, S.E., P.E. – Seattle University; Juan C. Reyes, PhD – Universidad de los Andes
Monday, Sep 16
1:30 pm
510930 - Thorndon Container Wharf - Post-earthquake Recovery of Container Operations
Location: Commonwealth 2
Alistair Boyce, CPEng – WSP Opus; Rob Presland – Holmes Consulting; Eng Liang Chin – Tonkin+Taylor; Anthony Delaney – CentrePort Wellington; James Lake – HEB Construction
Monday, Sep 16
1:30 pm
2D - Port Engineering (Extreme Events - Seismic Retrofit)
Location: Commonwealth 2
Azadeh Bozorgzadeh, PhD – Moffatt & Nichol
Monday, Sep 16
1:50 pm
514288 - Seismic Retrofit of a Historic Pier on Soft Soil
Location: Commonwealth 2
Benjamin Pesicka, P.E., S.E. – WSP; Robert Harn, P.E., S.E., M.ASCE – BergerABAM; Jacob Linke, P.E. – BergerABAM
Monday, Sep 16
2:10 pm
518606 - Seismic Retrofit of an Existing MOT Using Float-In Construction for Rapid Turn-Around
Location: Commonwealth 2
Marc I. Percher, P.E. – Moffatt & Nichol; Rod Iwashita, P.E., FASCE – Port of San Francisco; pratheep pratheepan; Zachory Pecor; Arul K. Arulmoli, PhD, P.E., G.E., D.GE, F.ASCE – Earth Mechanics, Inc.
Monday, Sep 16
2:30 pm
522636 - Seismic Performance and Rehabilitation of the Port of Manta After the 2016 Ecuador Earthquake
Location: Commonwealth 2
Pedro P. Rojas, PhD – ESPOL; Eduardo Miranda – STANFORD UNIVERSITY; Jose Barros – UNIVERSIDAD CATÓLICA DE SANTIAGO DE GUAYAQUIL; Dioselina Rosero – CONSULTOLA CIA. LTDA.; Wilmer Marquez – CONSULTOLA CIA. LTDA.; Leandro García – CONSULTOLA CIA. LTDA.
Monday, Sep 16
3:30 pm
938070 - Designing Port Infrastructure for Sea Level Change: A Survey of U.S. Engineers
Location: Commonwealth 2
Benjamin Sweeney – New Hampshire Coastal Program
Monday, Sep 16
3:30 pm
3D - Port Engineering (Coastal, Sea Level Rise)
Location: Commonwealth 2
Shane Phillips, P.E., D.P.E., D.CE – Mott MacDonald
Monday, Sep 16
3:50 pm
938072 - Measuring sea surface gravity waves using Smartphones
Location: Commonwealth 2
Matheus de Paula Vieira – Federal University of Rio de Janeiro; Pedro Guimarães
Monday, Sep 16
4:10 pm
513882 - Port of Los Angeles Sea Level Rise Adaptation Plan
Location: Commonwealth 2
Adrienne F. Newbold, P.E., PMP – Port of Los Angeles; Bettina Kaes, AICP, LEED, ENVSP – AECOM; Jeff Khouri, P.E. – AECOM; Richard Mast, P.E. – AECOM; Justin Vandever
Monday, Sep 16
4:30 pm
519441 - Predicting Coastal Conditions in San Francisco Bay and Other Estuaries with Neural Networks
Location: Commonwealth 2
Frank Salcedo, P.E. – Mott MacDonald; Scott Fenical, P.E., M.ASCE – Mott MacDonald; Craig Harter – Mott MacDonald
Tuesday, Sep 17
8:30 am
519260 - Seismic Response of Large Pile Moored Floating Structures
Location: Commonwealth 2
Erik Soderberg, S.E. – Liftech Consultants Inc.; Leah Olson, P.E. – Liftech Consultants Inc.; Michael A. Jordan, S.E. – Liftech Consultants Inc.
Tuesday, Sep 17
8:30 am
4D - Port Engineering (Floating Systems, Cruise & Ferry)
Location: Commonwealth 2
Scott E. Kuebler, P.E., S.E. – KPFF Consulting Engineers
Tuesday, Sep 17
8:50 am
519518 - Dolphin Restraint System for the Precast Concrete Floating Berth at the Haines Ferry Terminal
Location: Commonwealth 2
Chad Goodnight, P.E., PhD – BergerABAM; Scott Branlund, P.E., S.E., M.ASCE – BergerABAM; Doug Playter, P.E., M.ASCE – Jacobs; Tim Doggett, S.E. – Alaska Department of Transportation and Public Facilities
Tuesday, Sep 17
9:10 am
519529 - Precast, Prestressed Concrete Floating Berth at the Haines Ferry Terminal
Location: Commonwealth 2
Yeliz Firat, PhD, P.E. – BergerABAM; Frank Yang, P.E., M.ASCE – BergerABAM; Vu Phan, S.E. – Jacobs; David Lowell, S.E. – Alaska Department of Transportation and Public Facilities
Tuesday, Sep 17
9:30 am
521494 - Replacement of a Floating Dock for Passenger Ferries
Location: Commonwealth 2
Catrina Walter, P.E., M.ASCE – BergerABAM; Markus Wernli, P.E., PhD, LEEDAP – BergerABAM; Jacob Linke, P.E. – BergerABAM; Monica Blanchard, P.E. – Manson Construction Co.; Ron Panzero – King County Department of Transportation; Edward Parengkuan – Concrete Technology Corporation; Benjamin Pesicka, P.E., S.E. – WSP
Tuesday, Sep 17
10:30 am
519762 - Land Reclamation and Settlement of Reclaimed Land for New Ports
Location: Commonwealth 2
Chun Fai Leung, PhD, P.Eng. – National University of Singapore; James Lam; Salim Elfie; SC Chian
Tuesday, Sep 17
10:30 am
5D - Port Engineering (Geotechnical, Land Reclamation)
Location: Commonwealth 2
David Phelps, P.E. – Geotechnical Engineer
Tuesday, Sep 17
10:50 am
521521 - Influence of Dynamic Behavior of Soft Clay on Seismic Pier Response at the Port of San Francisco
Location: Commonwealth 2
Benjamin Serna, P.E., G.E., M.ASCE – Gannett Fleming, Inc.; Stephen E. Dickenson, PhD, P.E., D.P.E., M.ASCE – New Albion Geotechnical, Inc.; R. William Rudolph, P.E., G.E., M.ASCE – Gannett Fleming, Inc.; Kristen E. Chang, P.E. – Group Delta
Tuesday, Sep 17
11:10 am
521887 - Geotechnical and Structural Challenges - New Seattle Multimodal Terminal at Colman Dock Project
Location: Commonwealth 2
M. Birkan Bayrak, PhD, P.E. – Golder Associates Ltd.; Reda A. Mikhail, P.E. – Golder Associates Ltd.; Mike Wray, P.E., S.E., ENVSP, LEEDAP, M.ASCE – WSP; Jon Z. Mjelde, P.E., S.E., ENVSP – BergerABAM; William S S. Hegge, P.E.
Tuesday, Sep 17
2:00 pm
519521 - CFD Wave Loading and Response Analysis for Large Interconnected Float Systems
Location: Commonwealth 2
Chad L. Monfort, P.E. – Coastal Engineer; Scott Fenical, P.E., M.ASCE – Mott MacDonald; Richard Riley; Nathan A. Watson, P.E. – KPFF Consulting Engineers
Tuesday, Sep 17
2:00 pm
6D - Port Engineering (Coastal)
Location: Commonwealth 2
Kirk F. Riden, P.E. – Appledore Marine Engineering, LLC
Tuesday, Sep 17
2:20 pm
519667 - Understanding Flooding Hazards Posed to Coastal Infrastructure from Extreme Ocean-Driven Events at Future Sea Levels
Location: Commonwealth 2
Daniel J. Chadwick, E.I.T. – CWA Engineers Inc.; Ann-Marie Giesbrecht, P.Eng. – CWA Engineers Inc.; Nadine Clark, B.A. – CWA Engineers Inc.; Hammad Mir, PhD, P.Eng. – CMO Consultants Ltd.; Norman Allyn, P.Eng. – CMO Consultants Ltd.
Tuesday, Sep 17
2:40 pm
519701 - Use of Physical/Numerical Modeling in Design of an Exposed Quay at Port of Ashdod
Location: Commonwealth 2
Atilla Bayram, P.E. – Jacobs; Bill Paparis, P.E. – Jacobs; Sean O'Neil – Jacobs; Yang Zhang, P.E. – Jacobs; Victor Prilusky, P.E. – Jacobs; Daniela Ostrovsky – Israel Ports Development & Assets Company Ltd; Avi Elgaba – Israel Ports Development & Assets Company Ltd; Issam Saba – A.D.Y.R.; Klaas van-Weperen
Tuesday, Sep 17
3:00 pm
522653 - Middle Breakwater Comprehensive Condition Assessment
Location: Commonwealth 2
Claudio Fassardi, MS – Jacobs
Tuesday, Sep 17
4:00 pm
500281 - Repair of a Deteriorated Timber Seawall at the Port of Los Angeles, Berth 240
Location: Commonwealth 2
Marco A. Sanchez, P.E. – Port of Los Angeles; Amir Zavichi, P.E. – Port of Los Angeles; Mahsa Pan; Raj S. Varatharaj, P.E., G.E., M.ASCE – Earth Mechanics, Inc.; Jiri Herrmann
Tuesday, Sep 17
4:00 pm
7D - Port Engineering (Inspection, Rehabilitation and Redevelopment)
Location: Commonwealth 2
Bryan N. Jones, PE, DPE, DCE, AMPE – HDR
Tuesday, Sep 17
4:20 pm
519246 - National City Marine Terminal Berth 24-10 Rehabilitation
Location: Commonwealth 2
Frank Yang, P.E., M.ASCE – BergerABAM; Scott Branlund, P.E., S.E., M.ASCE – BergerABAM; Dante Valdez, P.E., S.E. – BergerABAM; Armando Mora, P.E. – Port of San Diego; Yeshitla Mulugeta, P.E., M.ASCE – Port of San Diego
Tuesday, Sep 17
4:40 pm
522282 - Investigation and Initial Stability Analysis of a Wharf on Severely Deteriorated Steel H-Piles
Location: Commonwealth 2
Daniel Philip Schuetz, P.E.(NH) – Simpson Gumpertz & Heger; Daniel Robbins, P.E.(NH) – Appledore Marine Engineering, LLC; Paul Schuman, PhD, P.E.(MA) – Simpson Gumpertz & Heger; Dominic Kelly, P.E.(MA), S.E.(CA, IL) – Simpson Gumpertz & Heger
Tuesday, Sep 17
5:00 pm
522358 - Failure Investigation and Rehabilitation of a Steel Sheet Pile Bulkhead
Location: Commonwealth 2
Zachary Jenkins, P.E., S.E., M.ASCE – Collins Engineers, Inc.
Wednesday, Sep 18
8:30 am
519204 - Simplified Planning Tool to Determine Staffing and Consultants Needs
Location: Commonwealth 2
Lincoln Lo, P.E. – City of Long Beach; Ramanjit Brar, P.E. – Port of Long Beach
Wednesday, Sep 18
8:30 am
8D - Project Development (Management, Financing, Delivery)
Location: Commonwealth 2
Thomas A. Ward, PE/SE, D.P.E. – WSP
Wednesday, Sep 18
8:50 am
519571 - Submitting Successful Federal Grant Applications for Ports
Location: Commonwealth 2
Jean Banker, MPP – Mott MacDonald; Andrew Cairns, P.E., D.P.E., PMP – Mott MacDonald
Wednesday, Sep 18
9:10 am
522256 - Bringing Design Build Procurement to Port Development
Location: Commonwealth 2
Keith Abraham – Nigel Nixon and Partners, Inc.; Nigel Nixon, P.E. – Nigel Nixon and Partners, Inc.
Wednesday, Sep 18
9:30 am
522591 - How a Collaborative Design Assist Approach Rebuilds Tribe’s Fishing Port While Operating
Location: Commonwealth 2
Edward DeBroeck, R.Eng, DBIA, M.ASCE – KPFF Consulting Engineers; Tessa Gardner-Brown, AICP – Floyd|Snider; Donald Oates, P.E., P.Eng., D.P.E., DBIA – KPFF Consulting Engineers; Jacob Zacharda – Pacific Pile & Marine; Brian Ward – Muckleshoot Indian Tribe
Wednesday, Sep 18
10:30 am
519486 - Large Diameter Fiber Reinforced Polymer Monopile Dolphin System Revisited
Location: Commonwealth 2
Thomas Ripley, PE – Whitman, Requardt & Associates; Cameron Troxel, P.E. – Whitman, Requardt & Associates; Patrick O'Brien, P.E. – Whitman, Requardt & Associates
Wednesday, Sep 18
10:30 am
9D - Port Engineering (Geotechnical)
Location: Commonwealth 2
Sean Gamette
Wednesday, Sep 18
10:50 am
519712 - Design Challenges – B Jetty Reconstruction, CFB Esquimalt, British Columbia, Canada
Location: Commonwealth 2
Upul D. Atukorala, PhD, P.Eng. – Golder Associates Ltd.; Roberto Olivera, PhD, P.Eng. – Golder Associates Ltd.; Rowland Atkins, P.Eng. – Golder Associates Ltd.
Wednesday, Sep 18
11:10 am
520703 - Seismic Analysis and Ground Improvement Design for the PCT Marine Terminal at the Port of Alaska
Location: Commonwealth 2
Samuel Christie, P.E., G.E. – COWI; Yu Zhang, PhD, P.E. – COWI; Stephen E. Dickenson, PhD, P.E., D.P.E., M.ASCE – New Albion Geotechnical, Inc.; Bob Pintner, P.E. – R&M Consulting, Inc.
E
Monday, Sep 16
10:30 am
1E - Government Affairs Panel
Location: Commonwealth 1
Erik Stromberg; Natalie Mamerow – ASCE; Jennie Granger – PennDOT; Mary Ann Bucci – Port of Pittsburgh Commission; Peter Stephaich – Campbell Transportation Company, Inc.
Monday, Sep 16
1:30 pm
2E - Alternative Financing for Ports and Waterways – Partnerships for Financing Panel
Location: Commonwealth 1
Norma Jean Mattei, Ph.D., P.E., F.SEI, F.ASCE; Robert Beduhn, P.E., ENVSP, AVS, M.ASCE – HDR; Chris Ragucci – Worldwide Terminals, LLC Fernandina; David Baxter – International Infrastructure Development and PPP Advisor; Raed EL-Farhan, PhD – The Louis Berger Group
Monday, Sep 16
3:00 pm
3E - PIANC Working Groups Update
Location: Commonwealth 1
Rachel Grandpre – USACE; Ron Heffron, P.E., D.P.E., F.ASCE – COWI; Victor Magar, PhD, P.E. – Ramboll; Donald Hayes, PhD, P.E. – Environmental Laboratory, U.S. Army Research and Development Center
Tuesday, Sep 17
8:30 am
4E - Port Engineering 101 - Part 1
Location: Commonwealth 1
William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Rune Iversen, P.E. – Simpson Gumpertz & Heger; Julie A. Galbraith, PE – Simpson Gumpertz & Heger; Danielle Goudreau, E.I.T. – Pare Corporation; Egbert van der Wal – Port of Rotterdam; Thomas A. Ward, PE/SE, D.P.E. – WSP; M. Ali Naeem, P.E. – Simpson Gumpertz & Heger
Tuesday, Sep 17
10:30 am
5E - Port Engineering 101 - Part 2
Location: Commonwealth 1
William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Rune Iversen, P.E. – Simpson Gumpertz & Heger; Julie A. Galbraith, PE – Simpson Gumpertz & Heger; Danielle Goudreau, E.I.T. – Pare Corporation; Egbert van der Wal – Port of Rotterdam; Thomas A. Ward, PE/SE, D.P.E. – WSP; M. Ali Naeem, P.E. – Simpson Gumpertz & Heger
Tuesday, Sep 17
2:00 pm
6E - Ethics, Engineers and Experts: Who Is Your Master
Location: Commonwealth 1
Michael Ports, P.E., Ph.D., WRE, D.NE, BCEE, F.EWRI, F.ASCE; Kenneth Goodwin, CP, A.M.ASCE
Tuesday, Sep 17
4:00 pm
Student and Younger Member Networking Session
Location: Commonwealth 1
Aaron Barta; Tom Kim, P.E. – HDR; William M. Bruin, P.E., D.P.E. – Simpson Gumpertz & Heger; Charlie Roberts, P.E.,D.PE,M.ASCE; Monique A. Anderson, P.E. – Shannon & Wilson, Inc.
Sponsored By:
Wednesday, Sep 18
8:30 am
8E - Ethics, Engineers and Experts: Who Is Your Master
Location: Commonwealth 1
Michael Ports, P.E., Ph.D., WRE, D.NE, BCEE, F.EWRI, F.ASCE; Kenneth Goodwin, CP, A.M.ASCE
Wednesday, Sep 18
10:30 am
9E - Sustainable Infrastructure - What's the Plan?
Location: Commonwealth 1
Elizabeth Burkhart, PE, D.PE, ENV-SP – Collins Engineers, Inc.; Lenna C. Hawkins, P.E., PMP – Executive Office, U.S. Army Corps of Engineers, Pittsburgh District
Back to Top