Erosion and Sediment Control

Case Study

SWPPP Implementation of Interim (Temporary) Erosion Prevention BMPs: Estimating Quantities and Costs.

Tuesday, February 13
10:20 AM - 11:20 AM

PDH: 1

Location: 103A

Level of Presentation: All: Suitable for a broad audience

Temporary erosion prevention BMPs (differentiated from those same BMPS that might be used to establish final perennial and permanent vegetation) proposed to limit soil erosion during periods of sequenced temporary inactive construction operations are based on specific manufacturer, DOT, or consultant standard specifications/provisions along with engineering judgment and experience. A full range of temporary erosion prevention BMPs will be discussed that were designed and implemented based on proposed service life, phase of work, and time of year. The class content (drawn from many experiences) will include an example decision matrix of temporary erosion prevention BMPs of standard practice developed for Minnesota Department of Transportation. The knowledge can be adapted to fit any means and methods used to define product types, classes or categories of BMPs,

Learning Objectives:

Target Audience: Academic,Consultant,Contractor,Engineer

Dwayne Stenlund

Natural Resource Program Coordinator
Minnesota Dept of Transportation

Dwayne is a certified professional in erosion and sediment control. He has worked in this capacity for the Minnesota Department of Transportation for more than 21 years and is involved with design, construction and maintenance using old, modified and new technologies to solve difficult soil and storm water quality problems. He has presented extensively over the United States on storm water management techniques, and yearly at the International Erosion Control Association Conference. He has a Master’s Degree from the University of Minnesota in plant biology and extensive work environmental constructability and commitment delivery for road and bridge projects.

Presentation(s):

Send Email for Dwayne Stenlund


Assets

SWPPP Implementation of Interim (Temporary) Erosion Prevention BMPs: Estimating Quantities and Costs.

Presentation

Attendees who have favorited this

Please enter your access key

The asset you are trying to access is locked. Please enter your access key to unlock.

Send Email for SWPPP Implementation of Interim (Temporary) Erosion Prevention BMPs: Estimating Quantities and Costs.