Stormwater Management
Case Study
PDH: 1
Level of Presentation: All: Suitable for a broad audience
Jamie McCutchen, PE
Principal
SW Products, LLC
Basic premise to hold water for pollutants to settle is resulting in smaller water quality orifices that are prone to clogging. This presentation will introduce the idea of using a skimmer with a non-clog design to enhance water quality while also reducing maintenance issues, based on two pilot projects in Greenville, SC and Charlotte, NC.
Basic premise to hold water for pollutants to settle is resulting in smaller water quality orifices that are prone to clogging. This presentation will introduce the idea of using a skimmer with a non-clog design to enhance water quality while also reducing maintenance issues, based on two pilot projects in Greenville, SC and Charlotte, NC.
Target Audience: Consultant,Contractor,Developer/Builder,Engineer,Government Agency,Storm Water
Principal
SW Products, LLC
Jamie founded CCAD Engineering in March 1999 to provide civil engineering and consulting services for developers, architects and municipalities in site work related projects. He attended Clemson University where he obtained his Bachelor of Science in Civil Engineering (1992). His expertise lies in designing commercial sites and residential subdivision lot layouts, stormwater and erosion control plans, utilities and roadways. He is a licensed Professional Engineer in SC, NC and GA.
Jamie is also Principal of SW Products, LLC. In 2013, Jamie invented the Marlee Float™ skimmer, an erosion control device used in sediment basins and permanent BMPs.
Case Study of Permanent Use of Skimmers for Lower Maintenance & Enhanced Water Quality
Monday, February 12
1:40 PM – 2:40 PM
The asset you are trying to access is locked. Please enter your access key to unlock.