395367 - Calibrating Storm Sewer Tunnel Modeling for Climate Change

Thursday, June 7
8:30 AM - 10:00 AM
Location: Regency Room
Co-Authors: Nathan Campeau, Minneapolis, MN – Barr Engineering Co.

The Capitol Region Watershed District (CRWD) owns and operates a six-mile storm sewer tunnel, the Trout Brook Interceptor, in Saint Paul, Minnesota, that services 8,150 acres including two major lakes. In 2005, CRWD constructed a hydrologic and hydraulic model of the tunnel to assess flooding potential along the tunnel alignment and evaluate tunnel modifications. Since 2005, CRWD has made updates and improvements to the model, including adding resolution to the model and incorporating tunnel modifications. In 2017, CRWD successfully calibrated the model to five monitoring locations distributed throughout the tunnel system.

Using the calibrated Trout Brook Interceptor model, CRWD modeled and evaluated design rainfall events up to the 100-year event, as well as the mid-century climate change projection for the 100-year event, about 40% higher than today’s 100-year event. To communicate flood risk, CRWD generated and shared inundation maps with stakeholders, including multiple affected cities and the state department of transportation. CRWD will use the calibrated model and inundation mapping to plan and evaluate infrastructure improvements. This presentation will highlight the challenges of modeling and calibrating a complex urban storm sewer tunnel system, and provide an overview of how the calibrated model was used to assess potential impacts of climate change.

Anna Eleria, MS

Water Resource Project Manager
Capitol Region Watershed District

Ms. Eleria is responsible for the development and implementation of Capitol Region Watershed District’s (CRWD) planning studies, capital improvement projects and grant programs. She manages the operation, maintenance and repair of CRWD’s Trout Brook Storm Sewer Interceptor System (TBI). She is also involved in the planning and design of a comprehensive rainwater harvesting and use system at the future site of MN United FC's soccer stadium. In addition, she served as project manager for CRWD’s Green Line Green Infrastructure Project and Highland Ravine Stabilization Project. Anna joined CRWD in 2008 and holds a B.S. in Natural Resources and Environmental Studies from the University of Minnesota and an M.S. in Water Resources Engineering from Tufts University.

Presentation(s):

Send Email for Anna Eleria

Nathan Campeau, MS

Senior Water Resources Engineer
Barr Engineering Co.

Nathan Campeau is a Water Resources Engineer with Barr Engineering Co., spending the last 14 years working on a variety of water resources projects focusing on the modeling and design of low impact development and green infrastructure practices in the urban environment. Nathan's assistance to clients has included designing low impact stormwater practices to treat and infiltrate urban runoff, developing hydrologic and hydraulic models to analyze existing and design new stormwater conveyance systems, and designing flood control systems. Nathan helps plan and design ecological designs in urban and brownfield spaces, including the Towerside District Stormwater System designed for the Mississippi Watershed Management Organization. Nathan is an accredited Envision™ Sustainability Professional and a registered professional engineer.

Presentation(s):

Send Email for Nathan Campeau


Assets

395367 - Calibrating Storm Sewer Tunnel Modeling for Climate Change



Attendees who have favorited this

Please enter your access key

The asset you are trying to access is locked. Please enter your access key to unlock.

Send Email for Calibrating Storm Sewer Tunnel Modeling for Climate Change